114、Tank roof assembly - Doer equipment
About tank roof assemblyThe top plate of the storage tank is made on the mould, and the verticality of the mould column and the rigidity of the mould shall meet the design requireme…
[2019.12.11] -
113、About tank wall assembly - Doer equipment
About tank wall assemblyAbout tank wall assembly:
[2019.12.10] -
112,How to assemble the tank bottom
How to assemble the tank bottomDuring the assembly process, temporary reinforcement measures shall be taken to prevent the instability and damage of the storage tank caused by stron…
[2019.12.09] -
131、Cryogenic liquid master tank - Doer equipment
Cryogenic liquid master tankProduct Description:Cryogenic liquid sub master tank refers to a storage tank in which multiple sub tanks containing media are connected in parallel and …
[2019.12.07] -
130、Industrial gas sub master tank - Doer equipment
Industrial gas sub tankProduct Description:
[2019.12.06] -
111、About 20000m ³ Preparation before construction of LNG cryogenic atmospheric pressure s…
About 20000m ³ Preparation before construction of LNG cryogenic atmospheric pressure storage tank (2)About 20000m ³ Welding material preparation for LNG cryogenic and atmospheric pr…
[2019.12.05] -
129、Liquid nitrogen mother tank -Doer equipment
Liquid nitrogen mother tankProduct description
[2019.12.05] -
128,Air heated gasifier - Doer equipment
Air heated gasifierThe air heated gasifier uses the natural convection of air to heat the low-temperature liquid in the heat exchange tube and make it completely evaporate into gas;…
[2019.12.04] -
127、Introduction of LPG water bath gasifier - Doer equipment
Introduction of LPG water bath gasifier1、 Features:
[2019.12.03] -
126,LNG gasification station - Doer equipment
LNG gasification stationThe gasification station integrates all functions of unloading, storage, gasification, reheating, pressure regulation, metering and odorization, and adopts P…
[2019.11.29] -
125,LNG sub master tank - Doer equipment
LNG sub tankLNG sub master tank refers to the tank in which multiple sub tanks containing LNG are connected in parallel and placed in the master tank filled with thermal insulation …
[2019.11.28] -
110,About 20000m ³ Preparation before construction of LNG cryogenic atmospheric pressure s…
About 20000m ³ Preparation before construction of LNG cryogenic atmospheric pressure storage tank (1)Introduction of tank structure: cryogenic storage tanks are widely used in produ…
[2019.11.21] -
109,Technical measures for construction of LNG peak shaving station in rainy season - Doer…
Technical measures for construction of LNG peak shaving station in rainy seasonHow to prepare for the construction of LNG peak shaving station in rainy season:
[2019.11.21] -
圖124,20000m ³ Calculation sheet for fire sprinkler water of LNG full capacity tank - Doer…
20000m ³ Calculation sheet for fire sprinkler water of LNG full capacity tank1. 20000m ³ Standard specifications and basis adopted in the design of fire sprinkler water calculation …
[2019.11.20] -
123,20000m ³ Dry powder calculation of LNG full capacity tank (Part 2) - Doer equipment
20000m ³ Dry powder calculation of LNG full capacity tank (Part 2)20000m ³ Dry powder calculation of LNG full capacity tank (Part 2)
[2019.11.20] -
122,20000m ³ Dry powder calculation sheet of LNG full capacity tank (Part I) - Doer equipm…
20000m ³ Dry powder calculation sheet of LNG full capacity tank (Part I)1)20000m ³ Code for design of dry powder fire extinguishing of LNG full capacity tank (gb50347-2004)
[2019.11.19] -
121,20000m ³ Calculation of maximum make-up gas volume of LNG full capacity tank - Doer eq…
20000m ³ Calculation of maximum make-up gas volume of LNG full capacity tanktwenty thousand ³ Determination of gas make-up volume of LNG full capacity tank
[2019.11.19] -
120,20000m ³ Bog calculation under leakage condition of LNG full capacity tank - Doer equi…
20000m ³ Bog calculation under leakage condition of LNG full capacity tank20000m ³ According to GB / T 26978.1-2011 design and construction of on-site assembled vertical cylindrical…
[2019.11.18] -
119,Calculation of maximum discharge capacity (bog) under tank fire and rollover condition…
Calculation of maximum discharge capacity (bog) under tank fire and tumbling conditions (Part 2)As for the calculation of maximum discharge capacity (bog) under tank fire and tumbli…
[2019.11.18] -
118,Calculation of maximum discharge capacity (bog) under tank fire and rollover condition…
Calculation of maximum discharge capacity (bog) under tank fire and tumbling conditionsDetermination of discharge capacity
[2019.11.16]