97, Scheme of instrument control system for full tank (1) - Doer equipment
Scheme of instrument control system for full tankDesign principle of instrument control system for full tank
[2019.11.01] -
96,About tank interlayer and inner tank purging pipeline - Doer equipment
About tank interlayer and inner tank purging pipelineThe nitrogen seal pipeline connecting with the nitrogen source of the system shall be reserved in the storage tank. Before the t…
[2019.10.31] -
95,On tank discharge and return system - Doer equipment
On the tank discharge and return system◆ Liquid out of storage tank (loading): each storage tank is equipped with 2 submerged pumps (single flow: ~ 450m) ³/ h. Lift: 140m.), The d…
[2019.10.31] -
94,Overview of LNG tank system technology - Doer equipment
Overview of LNG storage tank system processLiquefied natural gas from LNG liquefaction unit and LNG unloading platform is sent to LNG full capacity tank for storage through low temp…
[2019.10.30] -
93,On the performance of thermal insulation system and cold insulation material of storage…
On the thermal insulation system of storage tank and the performance of cold insulation materialsAnchor devices are evenly set around the lower part of the main container and the se…
[2019.10.30] -
92,How to choose the main equipment material of full tank - Doer equipment
How to select the main equipment material of full tankSelection of main vessel, secondary vessel and hot angle protection materials
[2019.10.29] -
91, Introduction to the tank - Doer equipment
Introduction to the storage tank ◇ The connecting pipe in the tank is mainly low-temperature pipe, and the sleeve is set at the connection between the low-temperature pipe and the…
[2019.10.29] -
90,On the inner and outer tank anchoring device of storage tank - Doer equipment
On anchoring device of inner and outer tanks◇ The anchoring device is evenly set around the lower part of the main container and the secondary container of the storage tank, and it…
[2019.10.28] -
89,Design of bottom interlayer and top insulation of atmospheric storage tank - Doer equip…
Design of bottom interlayer and top insulation layer of atmospheric storage tank ◇ About the insulating layer at the bottom of the atmospheric storage tank: laying common strength …
[2019.10.28] -
88,Doer company's instructions for equipment design change and material substitution -…
Dur's explanation of equipment design change and material substitution★ Design change refers to the notice of design change issued by the design unit or on-site design representati…
[2019.10.26] -
87,Introduction to management responsibilities of construction staff at Doer site - Doer …
Introduction to management responsibilities of construction staff in Doer site★ Project Manager
[2019.10.26] -
86,Measures to prevent water pollution in gasifier construction site - Doer equipment
Water pollution prevention measures of gasifier construction site● A sedimentation tank is set at the mixer front desk and the cleaning place of transport vehicles at the gasifier …
[2019.10.25] -
85,Doer noise control measures for field production equipment - Doer equipment
Noise control measures for on site production equipment of Doer companyAs a general contractor of construction enterprises, we must fully consider the impact of construction on the …
[2019.10.25] -
84,Measures for civilized construction of Doer equipment - Doer equipment
Measures for civilized construction of Doer equipmentThe management of civilized construction reflects the comprehensive management level of Doer equipment enterprise. The clean and…
[2019.10.24] -
83,Health protection measures for construction personnel of Doer equipment - Doer equipmen…
Health protection measures for Doer equipment construction personnel● According to the different nature of work, Doer equipment employees must wear labor protection articles suitab…
[2019.10.24] -
82,Safety training system for constructors during gasifier construction - Doer equipment
Safety training system must be established for constructors during gasifier construction● During the gasifier construction, the construction personnel entering the construction sit…
[2019.10.23] -
81,How to safely manage the aerial work during the construction of gasifier- Doer equipmen…
How to safely manage the aerial work during the construction of gasifier?● During the construction of gasifier, the operation above 2m (including 2m) of ± 0 foundation surface is c…
[2019.10.23] -
80,How to use fire safely and manage in gasifier construction
How to use fire safely and manage in gasifier construction ● In the process of gasifier construction, the fire system should be strictly implemented to achieve "three no fire&…
[2019.10.22] -
79,What must be done in gasifier arc welding?
What must be done in gasifier arc welding?In the gasifier arc welding, it must be done: in addition to the independent power switch, the welding machine shell should be grounded or …
[2019.10.21] -
78,Safety management of gasifier cutting and welding operation - Doer equipment
Safety management of gasifier cutting and welding operationThe fire prevention and explosion-proof work of metal cutting and welding within the scope of project management of gasifi…
[2019.10.21]