Fire alarm system for propane tank
One set of explosion-proof integrated camera (2 sets, 1 cloud desktop, 1 direct type) is set on the top of propane tank, with far-infrared night vision function, which is used to monitor the tank top fire and other dangerous situations, so that the production personnel can more intuitively understand the operation status of process unit. The design, installation and fixation of the camera shall be determined through negotiation with the buyer.
The tank top is equipped with two platinum thermistors (Platinum thermistors are symmetrically arranged), the explosion-proof instrument control terminal box at the bottom of the tank is equipped with modules, and the switch signal is output.
(1) According to the standard for construction and acceptance of automatic fire alarm system (GB 50166-2019), relevant product instructions and
The system diagram and the scene situation, the correct connection between the alarm system.
(2) Alarm control settings:
Three flameproof three wavelength infrared flame detectors with 4-20mA output and standby switch signal are set around the vent pipe;
The location of leakage from tank top to flare pipe is: 6 flame-proof combustible gas detectors; 4-20mA output, standby switch signal;
Other safety devices
Combustible gas leakage detection: combustible gas leakage detector is set on the top platform of the tank, which outputs 4 ~ 20mA signal.
Lightning protection grounding: the storage tank is connected to the lightning protection grounding grid of the whole station.
Prev: 178、Spray cooling device for propane full tank - Doer equipment
Next: 180、Function and overview of air heated carburetor - Doer equipment
News
- 216、Advantages of Double Metal Full Capacity Tank … [2023-05-09]
- 215、Design principles for low-temperature storage … [2023-05-09]
- 214、Low temperature storage tank safety education … [2023-05-09]
- 213、Objectives of project construction management-… [2023-05-09]
- 212、Quality service advantages of Doer large low-t… [2023-05-09]
- 211、Advantages of Doer Large Low Temperature Stora… [2023-05-09]
- 216、Design scope of atmospheric and low-temperatur… [2023-05-08]
- 215、Process flow of low-temperature LNG storage ta… [2023-05-08]
- 214、Testing methods for low-temperature argon stor… [2023-05-08]
- 213、Performance Description of Low Temperature Eth… [2023-05-08]